All trades · Permit BLD25-02885
Step 3 · STRUCTURE
Structural steel OPEN
Forest Hill Retreat Center · Foresthill, California
Tube-steel columns and beams that hold the glass walls and the roof. Shop drawings go to the engineer before anything is fabricated.
Scope
Fabricate and install the HSS steel columns, beams, and base plates per S1.0, S2.0, S3.0, SD1, and SD2, with grey primer.
The frame is the backbone of a mostly-glass lodge: columns and beams carry the roof and the glass walls.
Special inspection of field welding is required (continuous).
What to price
- Shop drawings first, submitted to the engineer of record before fabrication.
- Confirm member sizes on the structural sheets. Substitutions (for example where a catalog size is unavailable) need the engineer’s approval.
- Include fabrication, delivery, erection, and field welding.
Plan sheets
- S1.0
- S2.0
- S3.0
- SD1
- SD2
- Structural calculations (HSS frame, base plates)
Documents
Open or download the files for this trade, or the full bid-package folder.
Sequence
After the foundation and before framing.