All trades · Permit BLD25-02885
Step 1 · SITE
Site, utilities & trenching OPEN
Forest Hill Retreat Center · Foresthill, California
Trench, bed, and backfill the water, power, and sewer runs from the existing services to the new lodge.
Scope
Trench, bed, backfill, and recompact about 200 feet of trench for three utilities — water, power, and sewer — from the existing well, existing electrical service, and existing septic to the new cabin.
New 1½-inch Schedule 40 PVC water line with #10 tracer wire (A0.0 note 21).
Connection to the existing septic system, which stays in use.
Utility trench backfill and compaction per the soils report.
What to price
- Equipment and labor for excavation, bedding, backfill, and recompaction.
- Water line and tracer wire. Power and sewer conduits coordinated with electrical and plumbing.
- Donated labor or a mini-excavator and compactor would help this trade a great deal.
Plan sheets
- A0.0 Site Plan
- E1.0 Electrical
- Soils report
- Driveway standards
- March 2026 site photos (septic location is in the bid-package folder)
Documents
Open or download the files for this trade, or the full bid-package folder.
Sequence
Before or with the foundation. Coordinate with plumbing and electrical.
How you can help with this trade
Donate labor, donate or supply materials at wholesale, bid at cost, or refer a tradesperson or supplier you trust. Every path uses the same form, with this trade already checked.