All trades · Permit BLD25-02885
Step 5 · ENVELOPE
Roofing & gutters OPEN
Forest Hill Retreat Center · Foresthill, California
A Class A roof assembly, required on every new building in unincorporated Placer County, plus gutters that do not collect debris.
Scope
Standing-seam metal roof with 3-foot overhangs (roof plan A3.0), Class A roof covering and assembly, underlayment, flashing, and gutters.
The roofer gives the field inspector a Class A Certificate of Compliance at or before final inspection.
What to price
- Class A assembly as required by Placer County, including underlayment and flashing.
- Gutters detailed so they do not collect debris.
- Confirm the roof slope on A3.0 — the structural roof plan and the energy model do not use the same pitch.
Plan sheets
- A2.0 Elevations
- A3.0 Roof Plan
- S2.0
- County Class A roofing handout
Documents
Open or download the files for this trade, or the full bid-package folder.
Sequence
After framing and before windows (dry-in).
How you can help with this trade
Donate labor, donate or supply materials at wholesale, bid at cost, or refer a tradesperson or supplier you trust. Every path uses the same form, with this trade already checked.