All trades · Permit BLD25-02885
Step 4 · STRUCTURE
Framing & deck OPEN
Forest Hill Retreat Center · Foresthill, California
Raised wood floor, 2×6 walls, LVL roof framing, and a 4-foot wraparound deck on a 1,248-square-foot lodge.
Scope
Douglas fir-larch, No. 1, except 2x and 4x may be No. 2. Pressure-treated wherever wood touches concrete or the weather, and hot-dipped galvanized or stainless fasteners in that lumber. Moisture at enclosure cannot exceed 19 percent.
A lumber takeoff is in the bid package. It is a count, not a substitute for the plans. Field-verify every piece before you order.
Siding, soffits, and composite decking (the products that meet the wildfire rules) are listed with the siding trade unless you include them here and say so.
What to price
- Floor: 1¾ × 11⅞ inch 2.0E LVL joists at 16 inches, 23/32-inch APA floor sheathing, 6×10 pressure-treated dropped beams, 6×6 posts. Under-floor vents: twelve 8×14 vents (9.36 square feet provided; 8.32 required).
- Walls: 2×6 studs at 16 inches. Shear walls SW2 and SW3 are scheduled on SN1. Double top plates. Hold-downs where the schedule shows them. Typical header, unless noted, is a 6×8 with 2x trimmers.
- Roof: 1¾ × 14 inch 2.0E LVL rafters at 24 inches with LSSR1.81Z hangers, 5¼ × 14 inch LVL flush beams, LVL fascia, 15/32-inch APA roof sheathing. The structural plan labels a 1/12 slope. Title 24 models a 5-in-12 attic. Confirm the slope on A3.0 before you price the rafters.
- Deck: 4 feet deep, wraparound. 2×8 pressure-treated joists at 16 inches on LUS26 hangers. 6×6 posts at 12 feet maximum with PC6Z caps and PB66 bases. An 18-by-4-foot ramp and a 4-by-4-foot landing.
- Design loads on SN1: floor and deck live load 100 psf, roof live load 31.5 psf, ground snow 45 psf, wind 95 mph, exposure C, seismic design category D, site class D.
- Confirm the lumber list against the takeoff file, including LVL and sheet-goods lines. The takeoff lists one long LVL size twice; confirm the total before you order.
- Hardware on the takeoff includes LUS26, LUS26Z, LSSR1.81Z, PC6Z, HDU, A35, LTP4, H2.5A, CS16 coil strap, Titan HD anchors, and HDUS.
- Eight inches minimum from finish grade to the bottom of the wood wall. Sill plates on concrete are pressure-treated, with 3×3 plate washers.
Plan sheets
- S1.0
- S2.0 floor, roof, and ceiling framing
- S3.0 framing elevation
- SD1
- SD2
- SN1
- A1.0 for the deck outline
Documents
Open or download the files for this trade, or the full bid-package folder.
Sequence
After footings and steel columns. Windows, roofing, and rough trades follow the frame.
How you can help with this trade
Donate labor, donate or supply materials at wholesale, bid at cost, or refer a tradesperson or supplier you trust. Every path uses the same form, with this trade already checked.